First day roundup:
The flywheel will arrive by tomorrow (29th September) in its 3D printed form. I was facing issues with magnets as they were not allowing for any drilling. Tomorrow I'll go find some magnetic materials and magnetise them, if not then we'll use bearings, if not that then just a very straightforward Aluminium stand with a 2mm hole in its cross-sectional area. The motor stands and turbine will hopefully be done by today aswell. I'll get the plate board tomorrow to round off things.
As for the 3D CAD objects, the shaft, flywheel and motor have been done. Only the electromagnets and the outer casing are left to finish.
M
Mohammad Abdullah Salman
